Why are results for the last two construction stages not available?

Creation date: 12/11/2018 3:58 PM    Updated: 9/11/2023 5:21 PM    construction stages last stage missing stages
Answer:

In your Construction Stage Analysis Control, you specified the Final Stage to be "Final".
This function analysis runs only to this stage, not to analyse the other two stages. If you change this option to Last Stage, the analysis will run to the including all stages.

Files