Question:

Below is output from MIDAS. I am unable to understand the reason why PT force in CS4 is more than CS3, as i was anticipating force reduction over time. Kindly help me understand why results are counterintutive. Respective file has been attached.
5008 Tendon Primary CS2-SS 004(last) 1 I -2918.38 -1294.37 0
5008 Tendon Primary CS2A 002(last) 1 I -2864.41 -1270.78 0
5008 Tendon Primary CS3A 28 DAYS STRESSING 005(last) 1 I -7401.35 -3010.19 7.8
5008 Tendon Primary CS3-LAUNCHING 002(last) 1 I -7373.95 -2999.29 7.73
5008 Tendon Primary CS4-GREEN CONC 002(last) 1 I -7484.11 -3065.54 7.76
5008 Tendon Primary CS5-INTEGRAL 002(last) 1 I -7396.87 -3040.88 7.75
5008 Tendon Primary CS6-INFINITY 002(last) 1 I -6772.43 -2864.91 7.74

Answer:
In CS4, the concrete deck is casted and activated at the same stage. Kindly, activate the composite portion of the deck in next stage (CS5) with the desired age which I guess will be 28 days as the CSLL (Load denoting wet concrete) is deactivated at this stage which is 28 days after CS4. 




Update the composite section for construction stage value for other section.
Results obtained for tendon primary, My for element 5008 are