Dear Midas Team,
I have done a pre stressed bridge model and I have ran the calculation. I have
found the Tendon Stress (f_pe) to be much lower than the Tendon Stress Limit At
Service. What could be the reson for this?
I have applied the pre stressing force of 0.7*fy.
I have also checked the tendon losses at the final construction stage and it is
not that large.
What may be the reason that the Tendon Stresses are much lower than the Tendon
Stress Limit.
Files | ||
---|---|---|
DataImage83.png
181 KB
|
||
DataImage91.png
98 KB
|
||
DataImage53.png
88 KB
|
||
HDB type 1 r8.mcb
8 MB
|
||
HDB type 1 r8.mcb
8 MB
|
||
DataImage72.png
17 KB
|
||
DataImage96.png
34 KB
|